WHO WE ARE

  BUSINESS SOLUTIONS
  FOOD FACILITY DESIGN
  FACILITY MANAGEMENT
  HOSPITALITY BENCHMARKS
  CONTACT US

   
 

BUILDING REQUIREMENTS
FACILITY DESIGN
SUPPLY


 
 
   
   
 
     
 


____ FACILITY DESIGN _____________________________________________________

  • Functional and Economic Design of a Structure
  • Spatial Structure and Space Allocation Plan Compiling
    of RDS (room data sheets)
  • Subject-specific requirements for HVACR
    (heating, ventilation, air conditioning, refrigeration)
  • Pre-Outline Planning from Machinery and Equipment
    to Fixtures and Furniture (FF&E)

____________________________________________________________________________

The lack of subject-specific and scientific fundamentals and hence the corresponding doctrine, leads to a subordinated interior planning process and an underestimated shortfall. A thoughtful and intelligent interior planning process should consider that all machinery and equipment, as well as furniture and fittings, rely on defined norms and measurements, which in turn cause specific cubic measures. Even a one foot size difference can determine whether the required equipment can be installed at all, or whether dispensable building volume was created.

A synchronized construction engineering and interior planning optimizes a property’s functionality and minimizes the necessary building volume.